XINDE MARINE NEWS
Standard Club Issues Warranty of Seaworthiness Circular xinde marine news 2018-11-27 16:45


The Standard Club’s chairman Jeremy Grose has issued a circular on the warranty of seaworthiness to all its stakeholders.

Continuing warranty of seaworthiness

The managers are aware that, from time to time, owners/members have been offered contractual terms with counterparties that require the shipowner to provide a continuing warranty of seaworthiness for the entire duration of the voyage. Should this situation arise, the club would urge owners/members to exercise caution before entering into contract terms since such a warranty could prejudice their P&I cover.

Cargo risk cover

Cover for cargo risks is conditional inter alia upon the member not contracting on terms more onerous to the carrier than those of the Hague or Hague Visby Rules (HVR) or equally wide exemptions of the carrier from liability. Article III paragraph 1 of the HVR provides, for example, that the carrier must, before and at the beginning of the voyage, exercise due diligence to:

  • make the ship seaworthy
  • properly man, equip and supply the ship
  • make the holds, refrigerating and cool chambers, and all other parts of the ship in which
    goods are carried, fit and safe for their reception, carriage, and preservation.

HVR – Shippers advised to excise caution

Under the HVR, ‘exercising due diligence’ means taking all reasonable precautions to see that the ship is fit for the voyage contemplated. The carrier is not obliged to give an absolute guarantee of seaworthiness and the ship need only be seaworthy at the commencement of the voyage.

If a cargo owner can show that their loss was caused by a failure of the carrier to exercise due diligence to make the ship seaworthy before and at the commencement of the voyage, the resulting loss will fall under club cover. If, however, the loss was shown to have been caused by some event which affected the ship’s seaworthiness only during the voyage then, assuming the due diligence test in Article III paragraph 1 is passed, the carrier would not be liable to the cargo interests under Article III paragraph 1 of the HVR.

A continuing warranty of seaworthiness throughout the voyage alters that position and would make the carrier potentially liable for any and all events affecting the ship’s seaworthiness during the entire voyage. This would represent terms less favourable than the HVR and so place any resulting claims outside of club cover.

Owners and members are therefore advised to give serious consideration to the potential
ramifications on the cover of contracting on terms that give a continuing warranty of seaworthiness and to contact the managers for guidance before fixing on this basis.

Source:Standard Club

Please Contact Us at:

admin@xindemarine.com

展开全文

Related Posts

Setting the Record Straight on Asian Ship Management with High Standards, Rapid Progress and a Coming

Demetris Chrysostomou2025-08-18

Milestone Achievement: CPI P&I Club Surpasses 100 Million GT with the Entry of “OOCL Kapok”

Xinde Marine News Chen Yang2025-08-15

China's Globalization Drives Maersk's Optimism: A New Era for Container Shipping

Xinde Marine News Chen Yang2025-08-12

WASALINE WILL BECOME THE FIRST CARBON NEUTRAL SHIPPING COMPANY IN THE BALTIC SEA

Wasaline2025-08-12

GCMD and INTERCARGO partner to advance decarbonisation in the dry bulk shipping sector

GCMD2025-08-07

A New Shipbuilding Giant is Born: China State Shipbuilding Corporation Moves Closer to Completion of

xinde marine news Chen Yang2025-08-05