信德海事网-专业海事信息咨询服务平台

The flag of the 3rd Navibulgar ship in Navibulgar history, named Verila has been raised

On June 20, the flag of the 4th from the series of eight 32.150 tonne bulk carrier contracted by Navigation Maritime Bulgare, has been raised at the Chinese shipyard Jiangsu Yangzijiang Shipbuilding Co.
 
From the same series the company is already operating m/v Kom, m/v Bogdan and m/v Perelik. The ship has been financed by Bank of China and her classification society is DNV. Captain Marian Yotov and chief engineer Evgeni Tonev are her first master and chief engineer accordingly. Meanwhile final preparations are taking place of the 5th from the series of 32.150 tonne bulk carrier at the Chinese shipyard Jiangsu Yangzijiang Shipbuilding Co.
 
The vessel will be named Vezhen.
 
The first m/v Verila (ІМО 7016711) was built in “Georgi Dimitrov” Shipyard in Varna.

She was serving in Navibulgar fleet from 1969 to 2003.
 
On May 11, 2007, the flag of the second m/v Verila (IMO 9136931) was raised in the port of Algeciras. She was serving in Navibulgar fleet till 2018.

Source: Navibulgar

The opinions expressed herein are the author's and not necessarily those of The Xinde Marine News.

Please Contact Us at:

media@xindemarine.com



Ctrl+D 将本页面保存为书签,全面了解最新资讯,方便快捷。