XINDE MARINE NEWS
Hudong won an order for 2+8 main engines and LNG gas supply system from Yangzijiang xinde marine news Sarah Yu 2020-10-21 15:07


On October 16, Hudong Heavy Machinery, a subsidiary of CSSC Marine Power, and Jiangsu Yangzijiang Shipbuilding signed a contract for the construction of 2+8 WinGD 7X52DF main engines and LNG gas supply systems.

The series of main engines and gas supply systems signed this time will be used in the 690FEU dual-fuel-powered tank vessel built by Jiangsu Yangzijiang Shipbuilding for Greathorse International Ship Management.

HHM-WinGD X52DF series models are designed by WinGD under CSSC Marine Power and built by Hudong Heavy Machinery. The gas supply system is designed and constructed by Hudong Heavy Machinery. The gas supply system is a LNG gas supply system with complete intellectual property rights and developed by Hudong Heavy Machinery for 8 years.

Source: Sarah Yu, XINDE MARINE NEWS

The opinions expressed herein are the author's and not necessarily those of The Xinde Marine News.

Please Contact Us at:

media@xindemarine.com


展开全文

Related Posts

BIMCO Shipping Number of the Week: Suez Canal transits still 60% down 100 days after the last Houthi

BIMCO2026-01-08

Ningbo Containerized Freight Index Weekly Commentary: Freight Rates on Most Shipping Routes have Incr

NINGBO SHIPPING EXCHANGE2026-01-06

Ningbo Containerized Freight Index Weekly Commentary: Overall Demand Continues to Increase, and Most

NINGBO SHIPPING EXCHANGE2025-12-30

CIMC Enric Announces Commissioning of China’s First Large-Scale Bio-Based Green Methanol Project

xinde marine news2025-12-16

Ningbo Containerized Freight Index Weekly Commentary: Most Routes have Insufficient Demand, and the C

NINGBO SHIPPING EXCHANGE2025-11-24

Ningbo Containerized Freight Index Weekly Commentary: Transportation Demand Remains Weak, and Freight

NINGBO SHIPPING EXCHANGE2025-11-17