XINDE MARINE NEWS
Hudong won an order for 2+8 main engines and LNG gas supply system from Yangzijiang xinde marine news Sarah Yu 2020-10-21 15:07


On October 16, Hudong Heavy Machinery, a subsidiary of CSSC Marine Power, and Jiangsu Yangzijiang Shipbuilding signed a contract for the construction of 2+8 WinGD 7X52DF main engines and LNG gas supply systems.

The series of main engines and gas supply systems signed this time will be used in the 690FEU dual-fuel-powered tank vessel built by Jiangsu Yangzijiang Shipbuilding for Greathorse International Ship Management.

HHM-WinGD X52DF series models are designed by WinGD under CSSC Marine Power and built by Hudong Heavy Machinery. The gas supply system is designed and constructed by Hudong Heavy Machinery. The gas supply system is a LNG gas supply system with complete intellectual property rights and developed by Hudong Heavy Machinery for 8 years.

Source: Sarah Yu, XINDE MARINE NEWS

The opinions expressed herein are the author's and not necessarily those of The Xinde Marine News.

Please Contact Us at:

media@xindemarine.com


展开全文

Related Posts

[Xinde Interview] Heidmar CEO: “If You Want to Make Real Money, You Want to Be in Tankers.”

未知2026-03-03

The London P&I Club reports positive 2026 renewals, underpinned by disciplined underwriting and s

未知2026-03-03

LNG – From Waste to Wake

xinde marine news2026-03-02

Ningbo Containerized Freight Index Weekly Commentary:Freight Rates Increase on Most Routes, and Com

NINGBO SHIPPING EXCHANGE2026-02-28

The London P&I Club reports positive 2026 renewals, underpinned by disciplined underwriting and s

xinde marine news2026-02-26

Ningbo Containerized Freight Index Weekly Commentary: Liner Companies Tighten Post-Holiday Capacity,F

NINGBO SHIPPING EXCHANGE2026-02-26