XINDE MARINE NEWS
Qingdao Beihai Shipbuilding held steel cutting ceremony for CMA CGM's 5,500TEU 2# container ship Xinde Marine News Vivian Xu 2022-07-18 14:03

On July 15, CSSC Qingdao Beihai Shipbuilding held steel cutting ceremony for the 5,500TEU 2# container ship built for CMA CGM.
 
This ship is the second ship in the CMA CGM container ship project, and the commencement of this project marks another solid step for Qingdao Beihai Shipbuilding to the mass construction of container ships.
 
The ship has a total length of 255 meters, a width of 40 meters, and a depth of 22 meters. It can carry 5,598 TEU and is classified by BV. This series of ships are single propellers, suitable for transporting dry cargo containers, refrigerated containers and designated dangerous goods containers within the scope of technical specifications.

The opinions expressed herein are the author's and not necessarily those of The Xinde Marine News.
Please Contact Us at:
media@xindemarine.com

展开全文

Related Posts

The opportunity has arrived. COSCO SHIPPING Specialized Carriers, Chipolbrok and Haitong are all maki

xinde marine news2026-01-14

Sallaum Lines announces delivery of MV Ocean Explorer strengthening its sustainable fleet expansion

xinde marine news2026-01-07

Chipolbrok Adds Two More Newbuildings — Total of Six 60,800 DWT “Fore-Bridge” Heavy-Lift MPPs S

xinde marine news2026-01-06

The World’s First Methanol Dual-Fuel VLCC Is Now in Service,Delivered 4 Months Early

xinde marine news2025-12-24

Pacific Basin Announces the Acquisition of Four 40,000 dwt Handysize Newbuilding Vessels

xinde marine news2025-12-24

China Merchants Energy Shipping steps into the shuttle tanker arena

xinde marine news2025-12-22